Erection & Installation

Site planning, equipment coordination, frame erection, alignment, bolting, roofing, cladding, finishing, and handover.

Erection planning coordinates site readiness, access, temporary requirements, material sequence, lifting and access equipment, competent personnel, frame stability, alignment, connections, roofing, cladding, and finishing.

Site-specific method statements, risk controls, supervision, equipment checks, weather, and interfaces must be considered for the approved scope.

Benefits

Sequenced Site Work

Materials, access, equipment, and erection activities are coordinated around the site plan.

Alignment and Connection Checks

Frame position, stability, alignment, and agreed connection checks form part of the workflow.

Envelope Coordination

Roofing, cladding, flashing, drainage interfaces, and finishing are coordinated with the structure.

Applications

New steel building erectionRoofing and cladding installationExtensions, mezzanines, and structural additions

Typical process

  1. 01

    Review

    Confirm site readiness and approved erection information.

  2. 02

    Plan

    Coordinate sequence, access, equipment, and safety planning.

  3. 03

    Prepare

    Manage frame erection, temporary stability, and alignment.

  4. 04

    Execute

    Coordinate connections, roofing, cladding, and finishing.

  5. 05

    Close Out

    Complete agreed checks and handover.

Frequently asked questions

Requirements depend on the project, but typically include approved information, released foundations or supports, safe access, material laydown space, equipment planning, site coordination, and the agreed method and risk controls.

It can include frame erection, alignment, bolting, roofing, cladding, flashing, and finishing when those activities are included in the agreed scope.